Disruption by Turbines

This disruption is heavily opposed by 90% of South West Wales. Peaceful and legal protests are planned all the way along the route, and I advise people to join these protests. They can stand in front of the lorries as in the 1968 Prague Spring, when a student stood in front of an invading tank, and block them. I am researching the case for a Section 41 injunction. The Plaid Cymru / Labour policy on turbines is already in complete tatters because the subsidies will be dropped completely over the next eight years, beginning with a 25% cut this year . I feel that all who have stolen government money (turbine subsidies) should be prosecuted and made to pay it back, being made personally liable for massive environmental damage, notably politicians and wind turbine executives. Britain is essentially in a state of civil war over turbines. This is atrociously poor government. All these useless parts are foreign made, and paid for by British taxation which goes directly into the pockets of profiteers.

In a message dated 03/07/2012 09:42:09 GMT Daylight Time,

TURBINES ON WAY:

Disruption alert to drivers over wind farm work | Wind Watch
6 Jun 2012 … Road users in the Swansea Valley have been warned they face possible … Work
started on the 15-turbine Mynydd y Betws wind-farm, above … the site goes
through Swansea, starting at the city’s docks, and Neath Port Talbot.

www.wind-watch.org/news/2012/06/06/disruption-alert-to-drivers-over-wind-farm-work/ – 44k –Similar pages

Turbine traffic worries being put to the test | This is South Wales
4 days ago … THE powers that be in the Swansea Valley are hoping there will be no … The
route of the trial run commences at Swansea Docks and runs …

www.thisissouthwales.co.uk/Turbine-traffic-worries-test/story-16468650-detail/story.htmlSimilar pages

Police assurances on plan to transport giant turbine parts | This is …
14 Mar 2012 … Police assurances on plan to transport giant turbine parts … Loads of up to 169ft
in length will have to be driven from Swansea docks through …

www.thisissouthwales.co.uk/Police-assurances-plan-transport-giant-turbine/story-15515917-detail/story.htmlSimilar pages

Swansea Valley Wind Farm Protestors Admit Tree Defeat.
Wind farm protestors in the Swansea Valley have admitted defeat in their fight …
150 tonnes ??? to carry the huge turbines to a wind farm under construction on …
from Swansea Docks and travelling up the A474 through Pontardawe, is yet to …

www.trapp-online.org/index.php/component/content/article/233-swansea-valley-wind-farm-protestors-admit-tree-defeat – 23k – Similar pages

Firm told to ‘think again’ on moving huge wind turbines | This is …
12 Oct 2011… massive wind turbines through the Swansea Valley has been told to … from
Swansea Docks, through Pontardawe and Rhydyfro to Mynydd y …

www.thisissouthwales.co.uk/story-13538316-detail/story.htmlSimilar pages

Swansea – ABP Corporate
The Port of Swansea has capacity to handle vessels of up to 30000 dwt and
provides … 4 Quay in King’s Dock is used for grab-loading of coal and can handle …

www.abports.co.uk/Our_Locations/South_Wales/Swansea/ – 30k – Similar pages

Film wind turbine dummy runs, say protesters « Shropshire Star
8 May 2012 … Starting at 6am, the load will leave Swansea Docks on the M4 and is expected to
travel through Caersws, near Newtown, past Llanidloes and …

www.shropshirestar.com/news/2012/05/08/film-wind-turbine-dummy-runs-say-protesters/ – 41k –Similar pages

OTHER INFO:

http://stryveland.blogspot.co.uk/2012/06/is-it-still-possible-to-save-stryveland.html

http://cymruncodi.blogspot.co.uk/

 

http://partisan2011.blogspot.co.uk/2012/07/1-7-2012-partisans-against-windmills.html

Gethin.