Wind 18.59%, 3 – 23 mph, Wales 11 – 23 mph, 0918 local time

The wind speed in the Betws area is now 11 mph, so the effective wind speed is only 2 mph because 9 mph is needed to start the turbines. They are therefore producing essentially nohting all year round at the cost of many millions and environmental carnage. Solar is negligible at 1.24%, and hydro is negligible at 1.14%. Hydro could easily be increased to close to 100%. Nuclear is flat out, waiting for another major melt down.