Wind 13.01%, 1 – 16 mph, Wales 2 – 8 mph, 0719 mph

The wind speed in the Betws area is now 4 mph, so the derelict turbines, being turned by the wind into junk, are producing no power at all, because they need 9 mph to start. No power of any kind is being produced by rotating junk throughout all of Wales now, because the wind speed is only 2 – 8 mph. This is a typical pattern, so the windy junk was assembled in order to transfer subsidy money to a few people from taxpayers. What is needed is a combination of tidal turbine power, LENR and ES power stations. The ES circuits are now ready and tested. Solar is negligible at 1.93%, and hydro in its present state is a sad failure at 0.70%. Google “tidal turbines” to find the newest tidal stream turbine technology, which can be used anywhere in the world.


%d bloggers like this: