Wind 3.74%, 1 – 26 mph, Wales 1 – 10 mph, 0734 local time.

The mean wind speed in the Betws area is now 10 mph, an effective wind speed of 1 mph because 9 mph is needed to start the turbines. The rated speed is a steady 20 – 40 mph, so the derelict turbines are producing no power at all, a complete fiasco. So the turbines are useless. Solar is useless at 2.37% and hydro is useless at 0.45%. The entire renewables industry is useless at present and must be replanned completely to base production on steady tidal power, LENR and ES power stations.


%d bloggers like this: