Wind 7.35%, 2 – 18 mph, Wales 3 – 4 mph, 0735 local time

The mean wind speed in the Betws area now 3 mph, so the derelict and completely useless turbines are producing no power at all and should be demolished at developer expense. Wind has collapsed to 7.35% after only a day or so of low productivity due to a transient front. Solar is negligible at 3.75% and hydro is useless at 0.37%. In the meantime other industrialized countries will rapidly develop tidal and other kinds of stable hydroelectric production, LENR and ES.


%d bloggers like this: