Wind 4.55%, 1 – 18 mph, Wales 2 – 9 mph, 0745 local time

The effective wind speed in the Betws area now is zero mph, 9 mph mean wind speed minus 9 mph needed to start the turbines. So they are producing no power at all as usual. The same conclusion can be made for the whole of Wales today. It is obvious that these turbines were built only to get subsidies, not to produce power. My analysis over the past year shows this clearly. So they should be demolished at developer expense, all the subsidies paid back, and the developers prosecuted for tremendous environmental and wildlife damage. Ministers who allowed this to happen should come under a Commons investigation. Solar is a negligible 4.21% and hydro is a joke at 0.20%. Hydro should be close to 100% using tidal turbines. These can be supplemented by ES and LENR power stations.


%d bloggers like this: