Wind 1.69%, 1 – 11 mph, Wales 2 – 6 mph, 0710 local time

The wind speed in the Betws area is now 2 mph, so the gigantic pile of derelict scrap known as “wind turbines” in Swift’s Brobdignag are producing no power, a pitiful self satire. It takes 9 mph to produce any power, and a steady 20 – 40 mph for these things to produce anything effective. So Betws has been destroyed in order to boil an egg. This rotting and rotating fiasco is a monument to the war between Lilliput and Blefuscu, a war over which side to break a boiled egg. This is from Swift’s “Gulliver’s Travels” and a savage satire on the amazing folly of human nature. So an all out effort is needed to switch to tidal turbines, LENR and ES. That is common sense, but common sense is prohibited by Orwell’s Ministry of Truth. Solar is useless at 2.55%, hydro is Lilliputian joke at 0.45%. With a government like this, who needs boiled eggs?


%d bloggers like this: