The wind speed in the Betws area is no 6 mph, so the derelict turbines are producing no power at all as usual, it takes 9 mph to start them. No wind power at all is being produced in Wales now, because the wind speed is only 3 – 6 mph. Solar is negligible at 7.13%, hydro is a disaster at 0.51%. So this is a total failure brought about by greed for government subsidies. Any real government would begin emergency production of tidal turbines, ES and LENR power stations on an industrial scale.