Wind 13.22%, 2 – 29 mph, Wales 4 – 17 mph, 0817 local time

Elexon portals to www.gridwatch.templar.co.uk are down, so this is not quite real time data, but the wind speed in the Betws area now is 7 mph, and the derelict turbines are producing nothing at all as usual, because they need 9 mph to start. Solar is 3.87% so the solar panels in Mawr are producing a negligible percentage of electricity demand, and about nothing to total demand (electricity plus all kinds of fuel). Hydro is a pathetic 1.07%.


%d bloggers like this: