Wind 1.78%, 1 – 15 mph, Wales 2 – 4 mph, 0729 local time

The wind speed in the Betws area is now 2 mph, and in Wales it is 2 – 4 mph, so there is no wind power at all, because it takes 9 mph to start the giant turbines. So they are frequently entirely useless and all efforts should be started to raise the funds for a series of tidal lagoons in the Bristol Channel, only four miles from here in a direct line. The wind industry cabal has deceived the electorate and corrupted democracy itself. Solar is useless at 3.50% and hydro is also useless at 0.50% of electricity demand. In terms of total demand (electricity plus all kinds of fuel) these renewables provide essentially zero % after thirty or forty years of development and billions in subsidies. A series of tidal lagoons, and ES and LENR power stations, would have cost much less and generate 100% of electricity demand.


%d bloggers like this: