Wind 14.73%, 3 – 24 mph, Wales 3 – 18 mph, 0745 local time

The effective wind speed in the Betws area now is 2 mph, 11 mph mean sped minus 9 mph needed to start the derelict turbines. already showing rusty signs of the bloody corruption that built them. For example Fraunhofer Gesselschaft has recently resleased a report to say that the maintenance of off shore turbines costs a hundred times more than the cost of building them. They are prone to rusting in marirtime conditions, both offshore and onshore. The end of sibsidies in 2015 meant that wind turbines produce very few jobs. My study carried out over a year shows that they are useless at producing power, even in relatively windy conditions. Hydro today is a useless 4.31% of electricty demand, hydro is a joke at 0.41%. Recently a quarter of all wind turbine companies have gone bankrupt, and 112 solar companies have gone bankrupt. The wind industry propaganda is deceptive nonsense.


%d bloggers like this: