Wind 12.65%, 8 – 25 mph, Wales 10 – 11 mph, 0956 local time

The effective wind speed in the Betws area now is 2 mph, an average of 11 mph minus 9 mph needed to start the derelict turbines. So they are producing next to nothing all year round. The Mynydd y Gwair wind turbines will be no different. I feel that this violation of human rights should be condemned by the United Nations as a crime against democracy. Solar is negligible at 7.85% and hydro is a joke at 0.53%.


%d bloggers like this: