Wind 1.95%, 1 – 19 mph, Wales 2 – 12 mph 0748 local time.

The effective wind speed in the Betws area now is zero, 9 mph average minus 9 mph needed to start the derelict turbines. These are widely known to be completely useless. The Mynydd y Gwair turbines will also be completely useless if constructed against a large majority, as much as 90% opposed and ignored. There is a mass of data on my blog to prove that wind turbines are a waste of time and money. Solar is 3.89% and hydro is 0.89%, both negligible and useless. The obvious answer is made up of tidal turbines, ES and LENR.


%d bloggers like this: