Wind 5.10% 0 – 25 mph, Wales 2 – 10 mph, 0824 local time

The wind speed in the Betws area is now 2 mph, so the wind turbines are producing no power at all because it takes 9 mph to start them. After almost a year of daily monitoring it is clear that wind turbines throughout Wales amount to a complete disaster, the worst in industrial history. Mynydd y Gwair is being ripped to pieces in order to give the Duke of Beaufort some pocket money. The claim that these turbines power thousands of homes is pure hogwash. The electorate has been deceived and ignored by a corrupt cabal. An all out effort must be made to demolish wind turbines. They are useless and unstable. Hydro is negligible at 1.38%, and solar is at 9.22%, the highest I have seen it in a year. This is because there is a lot of sun as the longest day approaches. However, 9.22% is still completely negligible. Politicians do not know what they are doing and are interested only in themselves. This is a decadence similar to that which destroyed the Roman Empire.