The effective wind speed in the Betws area now is 1 mph, a mean speed of 10 mph minus 9 mph needed to start the derelict turbines. These produce a negligible amount of power all year round, and it is agreed almost unanimously that they were imposed disgustingly on a huge majority against them. The same is true of Mynydd y Gwair, a colonial imposition. Solar is a negligible 4.97% and hydro is a disgrace at 1.84%. Hydro should be nearly 100% using tidal power. So this energy policy was written by Clouseau to solved the problem.