Wind 10.50%, 1 – 21 mph, Wales 9 – 21 mph 0727 local time.

The wind speed in the Betws area is now 9 mph, effective wind speed of zero, because is takes 9 mph to start the derelict pseudoturbines. Therefore the unique ecology of Betws and Mynydd y Gwair will have to be painstakingly restored by demolishing this scrap, and carefully turning the access roads back into ecology. The bill to be paid by the corrupt cabal. Even if it takes fifty years, this should be the aim of everyone in the area. Solar is negligible at 3.48%, hydro is negligible at 1.38%. Tidal turbines would easily generate all the elecetricity needs of all Britain. ES and LENR should be brought online as soon as possible.