Wind 19.98%, 3 – 28 mph, Wales 9 – 29 mph, 0733 local time

The wind speed in the Betws area is now 9 mph, so the effective wind speed is zero, because it takes 9 mph to start the derelict turbines. The Mynydd y Gwair turbines will be just as useless. So I hope that the new government will scrap all wind turbines. Solar is negligible at 4.26% and hydro is a joke at 0.45%. Work on tidal turbines, ES and LENR should begin as soon as possible, otherwise there will be regular power rationing and power cuts. There has been another nuclear accident, an explosion at Flamanville in France. Radioactive iodine 131 has already reached Svanhold in northern Norway, where a spike in radiation levels has been detected. The French tried to deny that there was a leakage of radiation.


%d bloggers like this: