Wind 9.6%, 1 – 25 mph, Wales 10 – 25 mph, 0739 local time

The effective wind speed in the Betws area now is 5 mph, 14 mph mean wind speed minus 9 mph needed to start the turbines. Their optimal operational wind speed is a steady 20 – 40 mph, such wind speeds never occur in Wales or anywhere in the British Isles or Europe. So wind turbines are completely useless. It has been estimated that their net contribution to total demand (electricity plus fuel) is zero. Solar is 1.93% and hydro 0.7%, both completely negligible. I think that the Trade Union Movement all over Europe should strike permananetly against wind turbines until they are demolished. This would mean that no power could be taken form wind turbines, and none ed to them from the grid. I advocate this because democracy is being ignored. As Mynydd y Gwair is totally destroyed for no purpose, an angry and resentful 90% majority against them looks on in great contempt and seething anger.


%d bloggers like this: