Wind 9.77%, 2 – 20 mph, Wales 5 – 16 mph, 0754 local time

The wind speed in the Betws area now is 5 mph, so the giant turbines are producing no power at all as usual, because it takes 9 mph to start them. They are deteriorating rapidly and if subsidies are dropped they will not be maintained. So the pristine and irreplaceable beauty of Betws and Mynydd y Gwair will be destroyed completely and rotting monuments to corruption littered over a stark and ruined landscape. Solar is negligible at 5% and hydro is a joke at 0.23%. Nuclear is flat out and slowly causing the entire land surface of Europe to become dangerously radioactive (study at Max Planck chemistry, Mainz). Gas is nearing full capacity. With government like this who needs the devil?


%d bloggers like this: