Wind 1.88%, 1 – 27 mph, Wales 2 – 6 mph, 0803 local time

The wind speed in the Betws area is now 2 mph, so the giant turbines are producing no power at all because it needs 9 mph to start them. The wind speed in Wales now is 2 – 6 mph, so giant wind turbines are producing no power at all throughout Wales, and only 1.88% of electricity demand in Britain, effectively 0.00% of total demand (electricity plus fuel). The unique ecology of Mynydd y Gwair is being totally destroyed now in violation of conservation laws and human rights laws, so an all out effort should be made to demolish all wind turbines and prevent Mynydd y Gwair from being destroyed. Solar is useless at 3.85% of electricity demand and hydro is a bad joke at 0.41%. Grid power is being produced as usual by ancient nuclear power stations, which are leaking radiation and producing nuclear waste, and by imported gas, which releases methane into the atmosphere during its production. Tidal turbines and ES and LENR power stations would easily solve the problem.


%d bloggers like this: