Wind 4.3%, 0 – 11 mph, Wales 7 – 11 mph, 0740 local time

The wind speed in the Betws area is now 7 mph, so the giant wind turbines are producing no power at all and should obviously be demolished. They need 9 m.p.h to start. Solar is 2.55% and hydro is 0.8%, so both are entirely useless. These are percentage contributions to electricity demand, so the percentage contribution to total demand (electricity plus fuel) is essentially zero as pointed out in an article quoted on this blog recently. It has become clear that the wind industry knew that wind turbines are useless, they were put up merely to get subsidies from the taxpayer.


%d bloggers like this: