Wind 7.07%, 3 – 13 mph, Wales 3 – 7 mph, 0742 local time

The wind speed in the Betws area is now 5 mph, so the giant turbines are producing no power at all as Mynydd y Gwair is being ripped apart for mor euseless turbines. No giant wind turbine in Wales is producing any power at all, because it takes 9 mph to start them, and teh wnd speed across Waels is 3 – 7 mph. So the governmenst at all levels that allowed this fiasco to happen must have been completely incompetent becaseu they were atken in by wind turbine propaganda. The contribution of turbines to total demand (electricity plus fuel) is comepletely negligible. Solar now is 2.33%, and hydro is a joke at 0.20%. So renewables of this type are a complete failure. Nuclear is flat out and gas is being fired up to maximum. Google “Green energy catastrophe” to find a long list of renewable fiasco. The obvious answer is tidal turbines in the Bristol Channel, energy from spacetime and LENR. Wind turbines are totally useless. I pointed this out twenty five years ago.


%d bloggers like this: