The wind speed in the Betws area is now 7 mph, so the useless turbines are producing no power at all, the same will be true for the Mynydd y Gwair turbines if they are ever put up. For about 90% of the year there is not enough wind on Betws and Mynydd y Gwair to produce any power (wind speed less than 9 mph). Solar is a negligible 4.55% and hydro a negligible 0.52%. So the renewables industry is a total failure. It will be 100% successful if tidal hydro is built in the Bristol channel, and ES and LENR developed. Government is essentially useless, whatever the party, unless this energy fiasco is changed.