Wind 10.72%, 1 – 26 mph, Wales 6 – 12 mph, 0800 local time

The wind speed in the Betws area now is 6 mph, not enough to start the giant turbines, and throughout Wales almost no power is being produced by the wind turbines because they need 9 mph to start. Solar is negligible at 1.64% and hydro is also negligible. So the energy demand is still being met almost completely by nuclear and gas. Renewable energy will continue to be a total failure unless hydro is built up and ES and LENR introduced. Nuclear energy is being imported from France at huge cost.


%d bloggers like this: