Wind 5.63%, 1 – 20 mph, Wales 3 – 8 mph, 0745 local time

The wind speed in the Betws area is now 4 mph, not enough to start the entirely useless wind turbines (they need 9 mph to start generating). Solar is a negligible 0.84%, even though the sun has been shining for two or three days. So both wind and solar in Mawr are total failures. The steam coal reserves are not being used, and the thirty foot tide four miles away is not being used. So government at all levels is completely incompetent.


%d bloggers like this: