Wind 13.84%, 1 – 25 mph, Wales 8 – 25 mph, 0748 Local Time

The wind speed in the Betws area is now 8 mph, below the wind speed of 9 mph needed to start the turbines. So they are producing nothing at the cost of many millions. The ecology has been subjected to complete destruction for no purpose other than greed for money. Those responsible knew in advance that the wind speed was insufficient, so a future and competent government should prosecute them to the full extent of the law for environmental carnage, and demand repayment of all the subsidies. This would bankrupt the turbine companies, so the directors would have to demolish the turbines personally. Solar today is 0.00% again. On most days the contribution of solar to the grid is nothing at all, I have never seen it higher than 0.8% (University of Sheffield estimate on www.gridwatch.templar.co.uk because solar is not metred directly). Therefore the renewable energy policy of the government is in tatters, a complete disaster. It has failed completely to utilize the free gift of energy in the Bristol Channel, a thirty foot tide. It has failed to implement LENR and energy from spacetime. It runs ancient nuclear power stations flat out all the time, pouring nuclear waste into the environment. It can no longer cover up radiation leaks such as those at Trawsfynydd. Gas is almost flat out, and the environment has been torn apart for huge gas pipelines instead of bringing it in by sea to power stations directly adjacent to liquified gas container ships. Coal has to be imported into Wales, and it is not used for making products. “A Drunk Man Looks at the Thistle” (Hugh MacDiarmaid, Civil List 1950).


%d bloggers like this: