Wind 8.68%, 2 – 21 mph, Wales 2 – 11 mph, 0521 local time

The average wind speed in the Betws area now is 6 mph, it is well before dawn so solar is 0.00%. Therefore the forced industrialization of Mawr has resulted in the destruction of environment, culture and language for no purpose, because it takes 9 mph to start the turbines and about 90 – 95% of the time they produce nothing and the solar panels effectively produce nothing at all (www.gridwatch.templar.co.uk and met office wind map) The forced imposition of the Mynydd y Gwair turbines will worsen a complete fiasco. This is the result of remote government and gross corruption. Rationing of power will have to be introduced if this situation is not remedied.


%d bloggers like this: