Wind 5.37%, 1 – 26 mph, Wales 3 – 13 mph, 0805 local time

Wind has collapsed completely again and the average wind speed in the Betws area now is 3 mph, so the turbines are producing nothing as usual because they need 9 mph to start. It is cloudy and raining as usual, so the solar panels dumped on Mawr are producing nothing as usual. With power stations like this, every household is rationed to one light bulb a month and no heating. So much for the well hated Welsh Assembly Minister who let through Mynydd y Gwair. What is needed now is steady pressure for an all party agreement to demolish all wind turbines in Wales. Otherwise democracy will have been defeated by the wind and panel lobby. Both the turbines and the panels are easy to remove. I should think that power rationing will have to start soon because it is now too late to build water turbines in time.