Wind 3.26%, 2 – 26 mph, Wales 3 – 5 mph 0714 local time

Wind has collapsed again to a pathetic 3.26% contribution to demand. Nuclear and gas are essentially flat out and coal is fired up to about half capacity. So pollutants are being produced by nuclear and coal. The wind speed in the Betws area now is 3 mph, so the turbines are producing nothing at all because it takes 9 mph to start them. This is the case about 90% of the time, so obviously they should be demolished to stabilize the grid, and all the subsidies paid back to the tax payer with interest. They will deteriorate rapidly over the coming decade, and there will be little interest in maintaining them. All access roads and pylons should be demolished and the environment repaired as much as possible. Those responsible for severe environmental damage should be prosecuted to the utmost extent of the law. The solar panels in Mawr are producing nothing at all today, because the solar contribution to the grid is a spectacular 0.00% (University of Sheffield estimate in www.gridwatch.templar.co.uk). The solar panels should be removed and subsidies paid back with interest. Hydro is a disaster at 2%, even after heavy rain. Obviously the power of tidal hydro is needed. The most shocking discovery I have made in the past six months is that both wind and solar are completely useless. This means that government is completely incompetent in the age of pure humbug. The government of Mawr is non existent.


%d bloggers like this: