Wind 7.93%, 1 – 13 mph, Wales 9 – 11 mph, 0757 local time

The average wind speed in the Betws turbine area is 9 mph now, an effective wind speed of zero, because it takes 9 mph to start the turbines. Wind has collapsed completely again after a brief storm. This shows that the industry is useless and its wild claims are pure, cynical deception (“….for now I see / Peace to corrupt ….” in the words of Milton). So Mynydd y Gwair and Betws should be permanently opposed until they are demolished and all the land stolen from the People of Wales over the centuries returned in a Land Act. Nuclear is flat out, and gas is almost flat out. Coal is approaching maximum capacity because it is a cold morning with heavy demand (now 40.68 gigawatts). A few large tidal turbine lagoons would easily meet this demand until ES (energy from spacetime) comes on line using tens or hundreds of millions of patented Osamu Ide circuits. I hope that LENR will also come online soon.


%d bloggers like this: