Wind 19.12%, 6 – 22 mph, Wales 13 – 22 mph, 0805 local time

The effective wind speed in the Betws area now is only 6 mph, so very little power is being generated by the Betws turbines. The average wind speed is 15 mph now, but it takes 9 mph to start the turbines. This blog shows that they produce nothing 90% of the time, and they are the product of a capitalist cabal interested only in money. Mynydd y Gwair will be a complete fiasco, and all attempts should be made to legally disrupt the total destruction of this unique ecology against 90% of those polled. I advocate continuous strike action and work to rule, refusal to maintain or transport the turbines, refusal to distribute the power produced, and many other measures.