Wind 15.32%, 3 – 39 mph, Wales 11 – 19 mph

The wind speed in the Betws area today is 11 mph, it needs 7 – 9 mph to start the turbines, so they are generating enough for one slice of toast. Easier to use a fork and a coal fire, and cheaper. It is clear from my simple analysis over six months that wind turbines were forced upon Wales by the City of London in order to make a profit out of subsidies. They should be demolished and all subsidies paid back with heavy fines.


%d bloggers like this: