Wind 5.40%, 2 – 16 mph, Wales 5 – 10 mph, 0732 local time

This morning there is just enough wind speed (10 mph) to start the Betws and Hirwaun tutbines, which need a minimum of 7 – 9 mph to start. The percentage contribution of wind turbines to the British grid is a dismal 5.40%. So these failures dumped on the once serene and beautiful Betws (from the Latin “beatus”, meaning “holy place”) are producing nothing as usual. The people who forced turbines on the unwilling People must have known that there is very rarely enough wind speed. So this is a scam in my point of view, running to billions that are draining and weakening the economy every day. With government like this who needs organized crime?


%d bloggers like this: